A simple way to keep family, friends, and the curious informed about our comings, goings, and doings.

Friday, November 25, 2011

A Slight Glitch

Now what is a project without a setback here and there? Let me tell you about it while we are in the middle of it. I have all the outlet and switch boxes installed and have the wires run for all of them. Now to figure out what to do with them. I think a few may not be correct. That’s a long story and I’ll figure it out later. Can you find the wires?

photo 1

Here’s the kicker. My electrician – the one who is going to install the new electric panel, Tony by name – came to look things over. He discovered we only have a 125 amp panel. He also discovered that our meter – the one in the alcove under the roof – is also only 125 amps. We need 200 for the new addition. Question: do we only have 125 amps coming from Portland General Electric’s transformer located out back somewhere – in the neighbor’s yard or in a neighboring street, I don’t know where it is. This, of course means we have to involve Portland General Electric. They come out, discover our meter is under the roof in an alcove, and that our electric service comes in under the new addition. I knew this and I actually had the permission of a rather non-caring PGE employee to  go ahead and do this. The caveat being that if we ever had a problem with the line we would have to install a new meter at the back of the addition and run the service wire in the attic to the electric panel. We do have 200 amp service from the elusive transformer to our house (a buried cable, if you haven’t already figured that out).

Well, the above unnamed employee didn’t exactly speak for the company hierarchy so we have to install the new meter NOW. This involves getting the guy who locates power lines and other things, digging down and finding the power line, installing the new meter base, running the new service wire, getting this inspected and approved – then calling PGE to come and reroute the incoming buried cable. Tony is taking care of all this except the digging. Here is my friend Charles from our church digging the hole. Note how BIG the meter base is!

photo 2

Charles found the line without electrocuting himself. Tony is leaving on vacation. Oh yeah, I should mention that. He is going to visit his dad in Puerto Rico for a couple weeks. So I will do my part by getting the electrical IN the house inspected and (I hope – pray about this) approved. Then get the wall insulation installed. Tony will do his part when he gets back.

And that’s the way it is. The drama continues.

Friday, November 11, 2011

Weathered In

This is just a quick update to let you know where we are in the process. No pictures this time. Sorry, Sue.

The house is now “weathered in.” That means it it ready for whatever weather might come – roof is on, siding is on, windows are in, doors are on. The gutters are not on yet but the gutter guy is coming soon. Our contractor left today with all his tools. Now it is up to me – and subs.

Interior framing is done. Plumbers have done their thing. The BIG issue was whether they could get the sewer line hooked up with the proper amount of fall. The easiest way was to go under our house to the far corner and tie into our present sewer. This was the plan the boss preferred; his worker thought it wouldn’t work. However he got under there and discovered the line would just barely miss all the heat ducts and just barely make the necessary fall. PTL. I will install the fixtures when the time comes.

The next thing we do is put in the little boxes for the switches, lights, and outlets. Then run the wiring. I will do all this with help from Ginger, Joyce, and whoever else I can grab. I will need to hire an electrician to replace our present electric panel.

After the wiring then it is the insulation (I will sub that out) and then the sheetrock – I will sub that out also. My goal is to be done by December 19 when we leave for LA to be with the g-kids for Christmas. Honestly, I don’t think we will make it. But we will try.

Prayer request… that Ginger’s house sells very quickly.

Regarding things other than the house. We just spent Wednesday and Thursday in Everett, Washington attending the memorial service for Joyce’s Aunt Margaret. She was 99 years, 3 months and 7 days. I’m not sure I should say “old” because up until about a year ago she acted very young. The family asked me to officiate at the service. I considered it an honor. On the way home we got caught in terrible Seattle traffic and didn’t arrive here until 10:00 last night. Today we had a potluck at the church for the senior adults. And so it goes.

Hopefully, pictures next time.

Saturday, October 29, 2011

House, House, House

It’s amazing how one little thing can take up so much of a person’s time. Well, it’s not exactly little but it is certainly all consuming. Yes, I am getting time to do the church work for which I am being paid but…. well, you get the idea.

It has been so long since I posted anything that this will have to be rather simple and short. We moved into the new house on August 23. The remainder of the month was finishing up moving, cleaning the old house, and doing church work. Then we did more work on the house and yard. On September 17 we hosted a “Thank you Barbecue” for all those who helped us fix up the house and move in.

DSCN2582

On September 25 we had an Open House so anyone who was interested could see what all the falderal was about. About 50 people came.

DSCN2704DSCN2692

DSCN2690

Meanwhile we got the plans for our addition (for Ginger) from our designer, made some changes at the insistence of the county, and resubmitted them. They told me it would take three weeks for a permit to be issued. Three days later they called and said the permit was ready. I am the General Contractor for the job and I sub out what I can’t do.

On Tuesday, October 2 Harold and Fran agreed to do the foundation, framing, roof – what they call weathering in, i.e. getting it weather tight. The next day we had a Senior Adult trip and when we got home the dig out for the foundation was almost done. This is supposed to sound like things started moving fast because it did. I’ve been scratching just trying to keep ahead of things.

Let these pictures tell the story.

DSCN2796DSCN2820

DSCN2838DSCN2868

DSCN0892DSCN2909

DSCN2920DSCN2922

This gives you an idea of what is happening. As I write the roofing is half way up one side. There is black paper (called felt) on everything else. We have been blessed regarding rain – not much of it and not really a problem. It rained yesterday and will rain Sunday but all next week will be nice.

And so it goes on Jade Street. Come and see us.

Wednesday, August 31, 2011

We Are Blessed

The best way to tell about the last two months is to say, “Whew, I’m tired.” In fact I can’t remember the last time I was this tired. But we are blessed. We have had a verrrry busy two months. Okay, now that I’ve said that, let me show it to you in pictures.

DSCN2438

See, I said I was tired! Just don’t mess with my baby. Actually I think I was just waking up from a much-needed nap. Jeyanthi came to visit the 9th of July and went home the 24th of  August. She brought her mom and dad and brother and sister with her, of course. It sure was fun watching her change while she was here. She learned to roll from her back to her stomach and then almost to her knees to crawl. Her dad thinks she learned to say, “da da” but I think it was more like “gra pa.”

DSCN2419

She and auntie Ginger get along well. Ginger even went with them for their own week-long family vacation in Kentucky. They did that the week before they left for home. Here Jey and Ginger are studying the plans for Ginger’s addition to our house.

DSCN2414

More about the move later but here Jey and Lilly are enjoying the fun of empty boxes. And below they seem to  have shrunk as they sit in a huge chair on a trek to a children’s museum.

DSCN2253

DSCN2209

The Willamette Valley Fruit Company makes pies at a place just outside Salem. A friend helped us discover that every weekday from 9:00 to 11:00 is Happy Hour – a slice of pie is $1.00! We just HAD to show the kids this wonderful place.

DSCN2241

On Monday, July 25th we signed the loan papers for our house. But no key. They (Federal Government) wouldn’t let it close until August 1. But that week we were at Fir Point camp so we let Ginger pick up the key. She said it was quite anticlimactic. Instead of some big "Here’s-the-key-to-your-new-home” ceremony by the realtor, she left the key in an envelope at the Remax Office. But Ginger couldn’t get it on the 1st – something about not getting the fax that the loan went through. So Ginger picked it up on the 2nd, went to the house, and couldn’t get the key to work. After trying various doors, going back to the Remax office, getting the listing agent to help, they discovered the key really worked but the front door was stuck – they had to push really hard on it. So finally, what began about a year and half ago as an idea to move to Salem culminated on the 2nd day of August.

DSCN0793

As I said, we were at Fir Point Kids Camp having fun and getting more tired. But really the purpose in being there was to teach the Bible story in a way the kids will not forget. The theme was from Group Publishing – PandaMania. Many churches used it this summer.

DSCN0730

Some of you will recognize that Jana is a fireman warning us to be careful about fire as we act out the story of Elijah praying for fire from heaven to consume the sacrifice. The sacrifice was a nice big, mouth-watering Hershey’s chocolate bar. The point was made that a sacrifice is something that is important to us.

DSCN0796

Here we have a wonderful picture portrait of Hannah and Samuel. Remember, in obedience to a promise, Samuel was given to the priest to serve in the temple.

Fir Point camp extended from Monday to Friday. When we got home Friday it was a quick turn around to leave for our church camp out Saturday morning. It started Thursday and ended Monday so obviously we were a little late. It was at a campground west of Portland with lots of hiking trails. The picture below is one of my favorites. Jey is enjoying her ride as we hiked one of the trails.

DSCN0816_thumb

DSCN0806_thumb

Sunday morning we had our worship time in the amphitheater. About 80 people were at the campout but not all of them were there at the same time and some were relatives of our church people. Nevertheless there weren’t very many people in the church building back in Salem!

DSCN0821_thumb

Smores are always good and even better over a campfire rather than a barbecue (see an earlier post). When we got home from the campout it was time to go to work on the house. It needed paint…

DSCN2341

Thanks Carol. Also thanks to Wayne, Cathy, Michele, Jerry, Billie, Korak…

DSCN2321

…Josiah, Lilly, and Jana! I  guess a little fun makes the work a lot easier. There was a lot of cleaning, painting, and  fixing. We removed the carpet in the family room replacing it with laminate. The rest of the carpet was carefully cleaned.

DSCN2331

Joyce’s brother, Jack, came to give advice.

DSCN2352

My nephew, Roy (and wife Twyla) came to help with the laminate.

DSCN2394

Then it was moving time. I chose Tuesday, August 23 which gave us Wednesday to finish up the odds and ends of moving. The city of Salem chose the same two days to pave the street in front of the old house! They gave us 17 hours notice or I would have picked different days. At first they were going to start at the other end of the street, then decided to start at our end. My pickup is pulling the trailer in the picture above. The pickup belongs to Kalab, our assistant youth pastor. We also had another pickup and another small trailer. We all made one trip but the paving crew had too much tar on the road for the other two rigs so Kalab and I braved the elements to get to the house (actually the tar didn’t stick to the tires very much). The whole paving thing was simply a big inconvenience. The guy with the small trailer actually hand-trucked the washer and dryer down the street to his vehicle – plus some boxes. Between us and the paving, we gave the neighborhood something to talk about at dinner.

DSCN2399

Here’s our moving crew, L-R: Phil, Jeff, Wes, and Kalab. The Greencrest house is now clean and turned back to the owners.

There are a lot more pictures but I better post this. We are in the house, slowly unpacking boxes and putting things away. There are still things to do (window coverings are still  incomplete) but we are picking away at them. I’m tired but we are blessed.

Tuesday, July 19, 2011

And the weather is… the same

S’mores

For the benefit of you who live in parts of the world far removed from the Pacific Northwest, here is the latest weather report for our area: more of the same. “The same” meaning rain or showers or, at best, clouds with temps below normal. In other words we don’t know if this is a bummer summer or if summer hasn’t started yet. Still we note with glee that our heat index is not 129* nor are we in danger of floods or tornados or hurricanes or drought. We are, however, in danger of rusting.

That being said, we decided to have s’mores tonight. I fired up the barbecue (sitting on a board on a garbage can – remember we are temporary here) in the garage door opening (door is up!). Jana got HUGE marshmallows which squished out on all sides, got all over our fingers, lips, etc. None  of us looked very dainty but Lilly won the prize for “most messy.”

DSCN2168[1]

DSCN2160[1]

I got the prize for biggest mouth!

The Rally

Those of you who carefully follow the GeneandJoyce blog (now who wouldn’t? I can’t imagine!) you remember me telling about the RV Rally in Albuquerque two years ago. I think it was in April that year and it rained, snowed, sleeted, hailed, and all other things nasty. The Rally last year was in Louisville and we didn’t go. This year it was in Redmond, Oregon. We went. Part time. Last weekend. Because the kids were here and because we had a senior adult trip on Friday, Joyce and I got up real early Saturday morning, drove to Redmond, met Mike and Joanne, had fun Saturday and Sunday at the rally and drove home Sunday evening. Yes, we went to an RV Rally and stayed in a motel! It wasn’t cost effective to pull the fifth wheel over there. The rally was fun; the weather was okay.

DSCN2146[1]

This was our church Sunday morning.

Let me tell you about a fun aspect of our visit. Background first… Next Sunday Joyce, Jana, Ginger and I are teaching  Children’s Church. The theme for the summer is how our leisure time can be used for Jesus. We are going to teach about RVing and using some of our experiences as examples.  Okay, they always give away lots little freebies at these rallies so we got the idea to collect enough to give each of the kids something. Joyce wanted some of the Good Sam stickers to decorate the kid’s bags so she asked the lady if she could have a dozen or so and told her why. The lady gave her a bunch… plus some little repair kits, plus a tool kit. Joyce had her arms full; she found me and dumped the stuff in my bag. I went over the the display, talked to the lady and renewed my membership for three years (they were pushing a life time membership but I didn’t want to part with that much money right now). As a result she gave us a neat travel bag and then filled it with hats, visors, lanyards, and I don’t know what all. With the other pens, lanyards, fans, and what-not we collected, each child is going to get 5 or 6 things!

Seniors to Camp 18

DSCN2137[1]Twenty-six senior adults left the church Friday morning for Camp 18 Restaurant and Logging Museum. It is an rustic-looking building made of logs with a lot old logging equipment on the grounds around the place. We had to car pool because the bus isn’t back yet from it’s overhaul but we still had fun.

DSCN2108[1]

I caught Jackie, Joyce and Margaret vying for the attention of this old man.

DSCN2113[1]

Our people are at the big table and the small one at the left rear.

DSCN2134[1]

Joyce and Don located Sasquatch and Don thinks there is a bullet hole in him.

DSCN2119[1]

Clark and Jack look over some of the old equipment.

DSCN2117[1]

Look at the size of  Eunice’s taco salad!

It was a good week. The end.

Monday, July 11, 2011

The Kids Are Here. Yea!

DSCN0709

My goodness, how she has grown! From that little baby 6 months ago to chunky little gal, she certainly has her own personality. I took this picture last night so I could post a recent picture – otherwise you would be mad at me (huh, Suzie?)

They got here about 8:00 Saturday evening. Basically it was a good trip except that Jeyanthi developed a little diarrhea which made the last 3 hours about 4 very trying hours. She is doing better now. Next time I’ll post some pictures of the other kids doing something fun. So far we haven’t  done very much that is exciting.

Today Korak and I cleaned up all the suspicious (i.e. might leak) looking places on the RV roof and sealed all the seams with roof patch. (Remember last fall I posted that the roof leaked? I just covered it with a tarp and it has simply sat in the driveway looking rather neglected ever since). Anyway, I hope we got the leaky spot. Then we washed the Taylor car, the Mumau pickup, and the Mumau car. We’ll wash the RV tomorrow and rub on a coat of Gel-Gloss. Then it will be off to Ginger’s house to make some repairs to get it ready for sale.

You are just trembling to know about the house, aren’t you? Well…. we found out we will not close until August 1 OR LATER. Very disappointing but typical government. Since it is a foreclosure and since Bank of America cheated on a whole batch of foreclosures, every single one of them have to be reviewed and re-reviewed and re-re-reviewed. So Joyce and I are learning patience. It will happen. Eventually.

I worked today. I even barbecued hamburgers for dinner. I’m tired. I’m signing  off. Good  night.

Thursday, June 30, 2011

The Inspection Is Good

We met the inspector at the house today. He spent 3 1/2 hours going from the chimney to the dirt under the house. There are a fair number of little things that need addressing. Remember, this is a foreclosure so no work was done to get it ready for a sale. (A side bar here: I feel cheated because we did a ton of work – and money— on our Grants Pass house to get it ready to sell; zilch was done on this house. But I understand the difference). He found little things like a cracked toilet seat (ouch!), two electrical outlets that don’t work but no apparent switch to control them, door knobs that are loose or don’t work, and so on. Perhaps the biggest thing is that the electrical panel needs to be replaced. It is not a serious, right NOW issue and we will replace it when we build the addition.

One other issue. He couldn’t crawl under the house because pipes are in the way. However he could get his head in and look around. It all looks good and doesn’t smell like dry rot or sewage or anything bad. We are going to go on a little faith at this point. We will cut an access hole in the floor of the walk-in closet in the master bedroom. Most new houses have the access to the crawl space in a closet so this will not be something unusual. We need to add insulation under the house and in the attic. We need to paint the interior. Stuff like that. Some money involved but lots of work.

This is the bedroom that is painted and speckled – weird colors. It will get lots of Kilz and then some paint!

DSCN0661[1]

The main bathroom looking into the mirror.

DSCN0665[1]

The kitchen looking from the family room. We found out the dishwasher and garbage disposal don’t work. The cabinets are “okay” but will need replacing. Joyce wants to take out the cabinets in the foreground to open up the two rooms. The door leads to the garage.

DSCN0651[1]

Gas fireplace. I should have taken this picture when we had the fire going. The blower works; lots of heat. The bricks have been painted bright red. We’ll probably repaint them white. We’ll also replace the funky light fixtures.

DSCN0657[1]

Okay. That’s the house. Now for VBS. Joyce, Ginger and I have been teaching the Bible story at our church’s Vacation Bible School. The title is Son Harvest and it has a country fair theme (i.e. farmer). We don’t have as many kids as they expected so we teach three 30 minutes segments and have one segment free. These minutes include the story and working on the Bible verse – which means playing some games to reinforce it.

Here are a couple of our kids – not the one with the blue head. These were dressed up as scarecrows for a game we played.

DSCN2085

Ginger is enjoying a moment of quiet repose before the next onslaught of kids. Our friendly neighborhood scarecrow keeps watch.

DSCN2082

This is the Fruit of the Spirit tree Joyce and some of the high school helpers built. And you thought only God could make a tree!

DSCN2066

We have two more days. We’ll make it but I admit we come home each afternoon and take a nap. I’ve been walking about a mile each evening. I skipped it tonight! Well, until next time. Take care.

Monday, June 20, 2011

We Nabbed One–Maybe

There is a house on the north side of Salem we looked at a couple weeks ago. It is a HUD house which means a foreclosure and now the government owns it. Finally we decided to look again and take a friend with us who is the one who will draw whatever is necessary for Ginger to live there. The house is big – 1785 square feet; the lot is huge – .27 acres. It is 3 bedrooms, 2 baths with a living room, dining room, family room, fireplace with a gas insert, laundry room in the house, and of course a kitchen. The double car garage is huge also. The interior needs painting to hide the purple with lavender polka dot wall in the bedroom and the other weird colors. We’ll probably remove part of the carpet and put down laminate flooring. The kitchen cabinets will eventually need replacing but are okay for now.

We will need to add on so Ginger has her space but there is lots of room on the lot and room in the budget to do it (or so I figure!). We still  need to get an inspection and if it shows too many hidden things we will back out. That’s why I put the “maybe” at the top. We already know a few things that will need to be taken care of – like insulation in the attic.

HUD is kind of different in the way they do things (remember they are a government entity!!!). When they listed the house they gave 10 days to receive offers. They collected all those and after the 10 day period considered them based solely on the amount offered. At our agent’s suggestion we offered more than the asking  price. Offers are submitted via computer and website. The 10 day period ended at 10:00 last night (we submitted ours with 1 day and 9 hours remaining). Monday morning we got  a phone call from our realtor that we “won.” Were there any other offers? We’ll never know. Did we offer way too much? Well, as far as other offers, we don’t know. As far as value, no. This morning (Tuesday) we submitted the paper work just like we would in a normal transaction – earnest money, preapproval letter, etc.  etc.

Here are some external pictures – the interior ones will have to wait until we have easy access. Obviously this is the front, the next one is back, and final one is our back yard. Lots of land to take care of. What am I thinking?? Yes, that is an apple tree in the center. There are also a couple others – all of them need pruning.

DSCN0647[1]

DSCN0649[1]

DSCN0650[1]

How am I feeling? Thanks for asking. And thanks for your caring and concern. I am either back to normal (whatever that is) or very, very close. I have been walking every evening (sometimes with Joyce). Not as far as I need to but I’m working myself up to my 1.0 to 1.4 miles. I saw the doc the other day. This is the new one we had never met but had to have to escape the hospital. I think he will be a good family doctor. He basically said I can do whatever I feel like doing. He answered a bunch of questions: Where did the clot in my leg come from? They just happen sometimes. How will I know when it is gone? They assume it is gone after a few months and the ones in my lung are gone when I feel better (probably gone now). I am humbled by everyone’s concern.

Last Friday we had a Senior Adult Picnic Potluck (indoors at the church). Attendance was down but the fun was up. Everyone had a good time and the food was delicious.DSCN0631

DSCN0621

One question I asked in the Picnic Trivia contest was what was the biggest hamburger ever made? Answer: the record for the largest hamburger is held by Rutland, North Dakota. In 1982, the town made the World's Largest Hamburger, 3,591 pounds, which was consumed by some 8,000 people!

I don’t think they barbecued it. But happy barbecuing to you.